| 
The CPC Central Committee Political Bureau Standing Committee and Vice Premier, State Council Three Gorges Project Construction Committee Li Keqiang, member of the CPC Central Committee Political Bureau, the Chongqing Municipal Party Committee Secretary Bo Xilai, Mayor Wang Hongju was escorted to a New Area in the north of the CSIC (Chongqing) Sea Wind Power Equipment Co., Ltd. installed inspection and study.
Sea wind power installed by means of technology transfer from Germany to introduce 850KW series of variable speed wind turbine blade, the adoption of digestion and absorption, has developed a 2MW wind turbine variable-speed constant frequency, and has all the intellectual property, is currently being developed 5MW wind turbine, will be built in Chongqing Chaobaiyi of wind power equipment industry base.
During the inspection, Li Keqiang, and business executives, managers, workers and cordial conversation, went into production workshop view, but also climbed 23 meters high activity metal ladder to learn more about product performance.
Li Keqiang said that the introduction of advanced technology from abroad, must pay attention to digestion and absorption, and continuously improve its independent R & D capability, with its own core competitiveness.
|