|
|
|
|
| Over View |
 |
|
|
| Infrastructure and Facilities
|
|
As a Chinese saying puts it:" to entice a phoenix, one must first build an attractive next for it", the construction of CNNZ has an overall development mode. In two years since its development, a number of important infrastructure and facilities have been constructed and put to use. This has helped to create a favorable condition for the great influx of enterprises into the area. From 2003, the new round of comprehensive construction of such major projects as transportation, power supply, water supply and drainage, information facilities, ecological environment improvement and other infrastructure in the Zone’s area will involve an investment of RMB45 billion and this will help build an excellent environment for industrial development and living.
Power supply facilities: RMB1.55 billion has been invested in constructing four 220KV and fifteen 110KV electric power transformation and distribution projects, six secondary gas distribution projects and one 256KM main natural gas pipeline project.
Water supply and sewage system: RMB3.49 billion has been invested in constructing a water supply and sewage system. The planned immediate-period capacity of water supply is 300,000 m3/d and far-future capacity 500,000 m3/d. The quality of water output from the water purification plan as well as from the water distribution pipeline network will reach the EEC standard. The planned sewage capacity is 260,000 m3/day.
Information facilities: RMBI.483 billion has been invested in constructing a modern digital, intelligent and personal communication network that integrates voice, data and image transmission as well as a public-benefiting and commercial database adaptive to the market economy.
Comprehensive transportation network: RMB28.979 billion has been invested in constructing a comprehensive network that consists of highways, railways, waterways and airways. The Jiangbei Passenger Transportation Station, a switching center of Chongqing's railway transportation system, will be built and put into operation. The Cuntan container harbor area and logistics park that has a capacity of handling 700,000 standard-size containers and 300,000 tons of roll-on-board cargo trucks.
Road network: A #-form radiating main road network has been built, which includes 497 km roads with more than 16 m wide, bus bays and stops and four railed traffic lines that connect the New North Zone.
Cut through mountains and sail to the sea in order to invigorate chongqing.
Jinkai Avenue: The route, leading from Yuanyang Township to Renhe Township, is an expressway 54 m wide and 13.5 km long.
Jinshan Avenue: The route, leading from the riverside of the Jialing River in Lijia Township to Cuntan Harbor Area on the Yangtze River,is an expressway that measures 54 m wide and 11.6 m long.
JintongAvenue: The route, leading fromYuanyang Township to Dazhulin Township, is an expressway that measures 54 m wide and 10.2km long.
Jinhai Avenue: The route, leading from Dazhulin Township along the riverside to Lijia Township, is a landscape expressway that measures 16.5 m long.
Jinxing Avenue: The route, leading from Renhe Township to Tongyan of Yuanyang Township, is an expressway that measures 44m wide and 15.3 km long.
JinyuAvenue: The route, being a part of the Middle Ring of metropolitan area that traverses the New North Zone, is an expressway that measures 54 m wide and 6.4 km long.
Jinzhou Avenue: The route, leading from Lijia Township to Dazhulin Township, is an express way that measures44m wide and 7.3 km long.
The seven first-grade main roads combine with each other to form a "Jin (Gold) "-series road network expressive of the motto "Cut through mountains and sail to the sea in order to invigorate Chongqing". "Cut through mountains" allegorizes the determination of the people in the New North Zone to create a bright future in the spirit of reform and opening up while "sail to the sea" means to give up the near-sighted attitude and expand the view to cover the whole country and mingle into the world economy. "Invigorate Chongqing" is the common willingness of the 31 million people of Chongqing as well as the sincere wish and sacred requirement of the people bestowed on the New North Zone.
ECOLOGICAL ENVIRONMENT
RMB4.89 billion has been invested in constructing a number of large ecological green land and public green areas which make a harmony of "people, city and nature".
|
|